FACILINK SMART FACILITY DASHBOARD

Live snapshot — refreshes automatically as you edit either register. No manual tracking needed.
Tip: enable "Background graphics" in the print dialog to keep the colors
🤖 AI Advisor Ask a question about your Compliance, Assets, Risk, or Audit data

Building Compliance — Status Summary

Asset Management — AMC Status Summary

Asset Health Status

Combines AMC, lifecycle, repeat repairs, and linked PPM status — see each asset's row for exactly why.

Helpdesk — SLA Health

Assets by Criticality

Open Tickets by Category

Vendor Contracts — Status Summary

PPM Checklist — Status Summary

Inventory Status

Document Expiry Status

Staff Roster — Today

Utilities — Latest Readings

Indoor Air Quality Status

Water Quality (STP/WTP)

Carbon Footprint

ESG Snapshot

Breakdown Maintenance

Work Permits

Visitor Management

HSE Register

Internal Audit

Risk Management

Spend — This Month

Lease & Rent

Upcoming & Overdue — Next 10

Across compliance renewals, asset AMCs, helpdesk SLAs, vendor contracts, PPM tasks, and document expiries — most urgent first.
TypeItemCategoryDue DateStatusDays

Portfolio — All Sites

Every site you have access to, side by side — health at a glance, plus everything overdue or due soon across all of them together.
SiteLocationIndustry OverdueDue SoonHealthy

Upcoming & Overdue — Across All Sites

Same idea as your Dashboard's own list, combined across every site — the 15 most urgent items.
SiteTypeItemDue DateStatusDays

Building Compliance Register

Statutory items referenced against NBC 2016 and central Acts — verify local variations with your municipal corporation.
Compliance Item Applicable Last Renewed Next Due Status Responsible Doc Ref Remarks

Asset Management

Critical assets with warranty, AMC and service-cycle tracking.
Asset Install Date Warranty Expiry AMC Vendor AMC Expiry AMC Status Last Service Service Freq. Next Service Criticality Responsible

Vendor & Contract Management

Contract status is calculated automatically from the contract end date — same Red/Amber/Green logic as the other registers.
Vendor Service Category Contact Person Phone Email Contract Start Contract End Status Performance Remarks

Preventive Maintenance (PPM) Checklist

Recurring routine tasks — distinct from Asset AMC renewals. Next due date is calculated from Last Completed + Frequency.
Task Asset (Serial) Location Frequency Last Completed Next Due Status Assigned To Report Remarks

Helpdesk & Complaint Tracker

SLA status (Green/Amber/Red) is calculated automatically from the days-to-resolve targets set below.
📍 QR Locations for Public Complaint Reporting
Print a sticker per location — anyone who scans it can report a problem with no login at all, exactly the way a visitor or tenant with no FACILINK account would. A tag on each ticket below shows which ones came in this way.
Ticket ID Issue Location Raised By Raised Date & Time Priority Assigned To Ticket Status Resolved Date & Time SLA Status Remarks

Meeting Room Booking

A booking that overlaps an existing one for the same room is blocked outright, not just flagged — the room list below only needs setting up once.
🏢 Meeting Rooms
Set up the rooms available to book — this only needs doing once, or whenever a room is added or taken permanently out of use.
Room Date Start End Booked By Department Purpose Attendees Status Remarks

Consumables & Inventory

Status is calculated from current stock vs. reorder level — Red when at/below reorder level, Amber when within 50% of it.
Item Unit Current Stock Reorder Level Reorder Qty Vendor Last Restocked Status Remarks

Staff Roster

Today's on/off-duty status for deployed FM staff, plus a day-by-day attendance history per person — expand any row to view it.
Name Date of Joining Role Shift Location / Post Contact Today's Status Remarks

Document Register

An index of where documents are stored (paste a link to Drive/Dropbox/etc.) — this does not store the actual files.
Document Related To Link Uploaded By Upload Date Expiry Date Status Remarks

Energy & Utility Log

A running meter-reading log — electricity, water, diesel. No RAG status here; this is consumption tracking, not a deadline.
Each period compared against the one immediately before it, per utility type — electricity and water don't get blended into one meaningless total.
Utility Type Meter / Connection ID Reading Date Reading Value Unit Cost (₹) Remarks Geofence Flag for Review

Service KPIs — This Site

Real targets vs. actuals, not just Red/Amber/Green deadline status. Set a target percentage for each metric — actuals recompute live from your current data.

KPI Trend History

Uses the same snapshots as the Trends tab — click "Save today's snapshot" there to add a data point here too. Only shows KPIs that existed at the time a snapshot was saved.

Cost & Efficiency Insights

Patterns found in this site's own logged data — repeat repairs, vendor cost gaps, generator dependency, AMC bunching, utility spikes, and assets running past their own typical repair interval. No external benchmarks here, and nothing that claims to predict the future — just arithmetic on what your own records already show.

Indoor Air Quality

Periodic readings per zone. Thresholds follow common ASHRAE/WELL guidance (CO2 <800ppm good, 800–1000 moderate, >1000 poor; PM2.5 <12µg/m³ good, 12–35 moderate, >35 poor) — general guidance, not a certification.
Zone / Location Reading Date CO2 (ppm) PM2.5 (µg/m³) Temp (°C) Humidity (%) Status Remarks

Water Quality Monitoring — STP & WTP

Sewage Treatment Plant and Water Treatment Plant readings. Status is set by whoever's reading the plant — there's no universal "normal" threshold for MLSS, TDS, or hardness across every plant design, so this isn't computed automatically.
Plant TypePlant NameReading DateTDS (PPM) STP: MLSS / Backwash — WTP: Hardness / RegenStatusRemarks

Carbon Footprint

Estimated from the Utilities log and the Vehicle Fuel & Mileage log below — each logged entry's value is treated as consumption for that entry, multiplied by an emission factor. Indicative for internal tracking, not an audited GHG inventory.
Emission factors (editable — defaults are general estimates, confirm against current published figures for your reporting needs)
Electricity default: 0.71 kg CO2e/kWh — India CEA grid emission factor, FY 2024-25 (CEA CO2 Baseline Database, Version 21.0, Dec 2025). Diesel default: 2.68 kg CO2e/litre, Petrol default: 2.31 kg CO2e/litre — both standard combustion factors. Water and CNG have no default — set your own if you want them included.
MonthScope 1 (Diesel/Petrol, Company Vehicles) kg CO2eScope 2 (Electricity) kg CO2eScope 3 (Vendor Vehicles) kg CO2eOther (Water) kg CO2eTotal kg CO2e

Waste & Garbage Log

Tracked as a working record of waste volumes and disposal routes — not converted to a CO2e figure, since the right factor depends heavily on disposal method and isn't something to guess at.
DateCategoryQuantityUnitDisposal MethodRemarks

Vehicle Fuel & Mileage Log

Covers both company-owned and vendor-owned vehicles used for employee transport and logistics. Company-owned vehicle fuel counts as Scope 1 above; vendor-owned (contracted) vehicle fuel counts as Scope 3. Electric vehicles are logged for mileage records but aren't converted to CO2e — this tracks fuel litres, not charging electricity.
OwnershipVehicle IDPurposeFuel TypeDateFuel (L)Odometer (km)Driver / VendorRemarks

ESG Summary

A rollup of data already tracked elsewhere in this tool, organized into Environmental, Social, and Governance — not a certified ESG disclosure, a working internal view. The Social figure reflects current staff status, not a historical attendance rate.

Breakdown Maintenance

Unplanned equipment failures — separate from the scheduled PPM checklist. Track status and how far repair has progressed.
DateAsset / EquipmentLocationIssue Description PriorityAssigned ToStatusCompletionCost (₹)Downtime (hrs)Remarks

Visitor Management

Who's on site, who they're here to see, and when they checked in and out — with ID and badge tracking.
VisitorCompanyHostPurpose Check-InCheck-OutIDBadge #Vehicle #StatusRemarks

Work Permits — Hot & Cold Work

Permit-to-work register for hot work and cold work — with precautions and closure sign-off.
Permit TypeLocationWork Description Requested ByContractorValid FromValid To StatusPrecautionsClosure

HSE Register

Health, Safety & Environment incidents — with root cause analysis. Expand a row to complete the RCA.
DateLocationCategorySeverity DescriptionStatusReported By

Internal Audit

Internal and external audit findings — with risk factor, assigned owner, and target vs. actual closure dates.
TypeAudit DateAuditorArea FindingRisk FactorAssigned To Target ClosureStatusRemarks

Spend Management

Opex and Capex spend, logged for analysis and budgeting.
DateTypeCategoryDescription Amount (₹)VendorAsset (optional)Budget HeadApproved ByRemarksFlag for Review

Risk Management

Enterprise risks — rated by Likelihood × Impact, a standard 3×3 grid. Each risk gets a mitigation plan and an owner.
CategoryRisk DescriptionLikelihoodImpact RatingMitigation PlanOwnerReview DateStatusRemarks

Our Lease — as Tenant

This facility's own lease to the landlord/building owner. The warning window uses each lease's own notice period when set (falls back to 90 days if not).
PremisesLandlordLease StartLease End Rent (₹/mo)EscalationSecurity DepositNotice PeriodStatus

Tenants We Manage — as Landlord

Space this facility rents out to others. Rent we pay (above) can be logged as real Spend Opex entries; rent we collect here is income, which Spend Management doesn't track.
TenantUnitArea (sqft)Lease StartLease End Rent (₹/mo)Security DepositLast PaymentStatus

Alerts & Notifications

Every Red (overdue) and Amber (due within 30 days / SLA at risk) item across compliance, assets, and helpdesk tickets — most urgent first.

Team & Access

Everyone listed here sees and edits this site's live data. Roles: owner > admin > member (can edit) > viewer (read-only).
NameEmailRoleJoined

Email Notifications

Off by default — turn this on only if you want it. When on, an email goes out when a new item is created, or when something turns Red/overdue (Contract Expiry, SLA Breach, Compliance Expiry, PPM Due, Inventory Shortage, Document Expiry) — never repeated for something that's already been red a while.

WhatsApp Notifications & AI Advisor

Off by default. When on, a red/overdue item also sends a WhatsApp alert to the numbers below (in addition to email, not instead of it). Those same numbers can also message this WhatsApp number directly with a question — "which licenses expire next month?" — and get an answer from the same AI Advisor logic used on the Dashboard.

Utility Reading Geofence

Optional. Set this site's real-world location so a reading submitted from far away gets flagged for review — it still saves, nothing is ever blocked. Leave both fields empty to turn this off entirely; no location configured means nothing gets flagged.

AI Advisor Provider

By default, questions asked here and via WhatsApp go through this deployment's shared Anthropic key. Bring your own key from a different provider — Anthropic, OpenAI, or Gemini — and this site's questions route to that instead, billed to your own account.

Integrations — Pull Data Automatically

Connect a meter, CMMS, or CAFM system that exposes a REST+JSON API, and this site's data will update on its own. Manual entry keeps working exactly as before — this is an additional way data can arrive, not a replacement.
NameFeeds IntoSync ModeLast RunStatus
Overdue / Expired Due within 30 days Compliant / Active Not applicable / No date set
Data is shared live with everyone on this site.